A UK company wants to build a large solar farm with back-up batteries around villages in the area. I have replied to their questionnaire on line. If eventually approved building will start in 2022 and the farm will be operational in 2025.
Although I have few concerns overall, I have raised the issue of RF pollution if they design and fit power converters "on the cheap". This unlikely to affect me, but could make life tough for those trying to detect weak signals nearer these sites.