17 Apr 2015

Field work?

My tiredness is still a problem but I am getting closer to restarting field work at VLF.  I bought a new soldering iron and have found a replacement bit for my old Weller iron (it needs a plug removing before I can use it though) so I should be able to match my 5W earth-mode VLF beacon to the earth-electrodes at this QTH. This will then allow me to do a trip to my first location to see if I can copy the signal. I hope to do all this in the next few days. It may need my XYL to help, but I am sure she will not mind! You may recall, I tested the RX side with Spectran in the lounge a few weeks ago and could copy the earth-electrode VLF beacon (running QRSS3 into a dummy load) using an E-field probe.

No comments:

Post a Comment